Previous incidents

August 2026
Aug 19, 2026
1 incident

Paraguay - Maintenance

Resolved

Resolved Aug 19, 2026 at 6:36pm UTC

We would like to inform you that Container Z1 is temporarily out of service due to transformer rotation work.

The modulation event, which began on August 19, 2026, at 08:00 (GMT-3), ended on August 19, 2026, at 15:36 (GMT-3) and lasted 7 hours and 36 minutes.

1 previous update

Aug 18, 2026
1 incident

Norway - Curtailment

Degraded

Created Aug 18, 2026 at 11:32am UTC

Operations are reduced due to high prices

Aug 14, 2026
1 incident

Paraguay - Maintenance

Resolved

Resolved Aug 14, 2026 at 3:04pm UTC

We would like to inform you that container D22 was temporarily out of service due to an electrical system issue that caused the main circuit breaker (TM) to trip.

This event began at 11:27 hours (GMT -3) and concluded at 12:04 hours (GMT -3), with a total duration of 37 minutes.

1 previous update

Aug 13, 2026
3 incidents

Texas - Curtailment

Resolved

Resolved Aug 13, 2026 at 11:22pm UTC

Dorothy_AC002: Project Dorothy has been curtailed due to the requirement to draw power exclusively from the wind farm in compliance with the Utilities' Curtailment Rules [4CP or Grid Prices], but there is not enough wind at the moment.

1 previous update

Paraguay - Maintenance

Resolved

Resolved Aug 13, 2026 at 6:17pm UTC

We would like to inform you that container B12 was temporarily operating at reduced production due to a failure of the cooling system is now Resolved

1 previous update

Paraguay - Maintenance

Resolved

Resolved Aug 13, 2026 at 5:36am UTC

We would like to inform you that container Z3, racks 4, 5, 6, and 7 were temporarily out of service due to an electrical system issue that caused the main circuit breaker (TM) to trip.

This event began at 01:22 hours (GMT -3) and concluded at 02:36 hours (GMT -3), with a total duration of 1 hour and 14 minutes.

1 previous update

Aug 12, 2026
1 incident

Texas - Curtailment

Resolved

Resolved Aug 13, 2026 at 12:17am UTC

Dorothy_EC007: Project Dorothy is now exiting curtailment and energizing.

1 previous update

Aug 11, 2026
1 incident

Texas - Curtailment

Resolved

Resolved Aug 12, 2026 at 12:11am UTC

Dorothy_EC007: Project Dorothy is now exiting curtailment and energizing.

1 previous update

Aug 07, 2026
1 incident

Texas - Curtailment

Resolved

Resolved Aug 7, 2026 at 10:26pm UTC

Dorothy_EC007: Project Dorothy is now exiting curtailment and energizing.

1 previous update

Aug 06, 2026
2 incidents

Texas - Curtailment

Resolved

Resolved Aug 6, 2026 at 11:12pm UTC

Dorothy_EC007: Project Dorothy is now exiting curtailment and energizing.

1 previous update

Texas - Curtailment

Resolved

Resolved Aug 6, 2026 at 11:01pm UTC

Dorothy_EC007: Project Dorothy is now exiting curtailment and energizing.

1 previous update

Aug 05, 2026
1 incident

Texas - Curtailment

Resolved

Resolved Aug 5, 2026 at 11:56pm UTC

Dorothy_EC007: Project Dorothy is now exiting curtailment and energizing.

1 previous update

Aug 04, 2026
1 incident

Texas - Curtailment

Resolved

Resolved Aug 5, 2026 at 12:13am UTC

Dorothy_EC007: Project Dorothy is now exiting curtailment and energizing.

1 previous update

Aug 03, 2026
1 incident

Texas - Curtailment

Resolved

Resolved Aug 4, 2026 at 12:10am UTC

Dorothy_EC007: Project Dorothy is now exiting curtailment and energizing.

1 previous update

Aug 02, 2026
1 incident

Texas - Curtailment

Resolved

Resolved Aug 2, 2026 at 11:31pm UTC

Dorothy_EC007: Project Dorothy is now exiting curtailment and energizing.

1 previous update

Aug 01, 2026
1 incident

Texas - Curtailment

Resolved

Resolved Aug 1, 2026 at 11:11pm UTC

Dorothy_EC007: Project Dorothy is now exiting curtailment and energizing.

1 previous update

July 2026
Jul 30, 2026
1 incident

Texas - Curtailment

Resolved

Resolved Jul 30, 2026 at 11:01pm UTC

Dorothy_EC007: Project Dorothy is now exiting curtailment and energizing.

1 previous update

Jul 26, 2026
1 incident

Paraguay - Curtailment

Resolved

Resolved Jul 27, 2026 at 1:20am UTC

ANDE instructed us to partially stop production, which was implemented as requested. The reason provided by ANDE was: overload on the LI-220 kV PIH-MD line.

They contacted us on July 26, 2026, at 18:35 (GMT -3) via WhatsApp message, approximately 18 minutes before the requested curtailment began. As usual, no email notification was received.

The curtailment began on July 26, 2026, at 18:53 (GMT -3) and concluded at 22:20 (GMT -3), lasting a total of 3 hours and 27 minutes.

1 previous update

Jul 24, 2026
1 incident

Paraguay - Curtailment

Resolved

Resolved Jul 27, 2026 at 11:40pm UTC

ANDE instructed us to partially stop production, which was implemented as requested. The reason provided by ANDE was: overload on the LI-220 kV PIH-MD line.

They contacted us on July 24, 2026, at 17:18 (GMT -3) via WhatsApp message, approximately 1 hour and 2 minutes before the requested curtailment began. As usual, no email notification was received.

The curtailment began on July 24, 2026, at 18:20 (GMT -3) and concluded at 20:40 (GMT -3), lasting a total of 2 hours and 20 minutes.

1 previous update

Jul 22, 2026
3 incidents

Texas - Curtailment

Resolved

Resolved Jul 23, 2026 at 4:04am UTC

EC007: Project Dorothy is now exiting curtailment and energizing.

1 previous update

Paraguay - Power Outage

Resolved

Resolved Jul 22, 2026 at 8:07am UTC

the containers (D22, Z1, Z2, and Z3) were temporarily out of service due to an overvoltage event on the LT-500 VHA-VAL-AYO transmission line.

The event began on July 22, 2026, at 01:24 (GMT -3) and concluded on July 22, 2026, at 05:07 (GMT -3), with a total duration of 3 hours and 43 minutes.

1 previous update

Norway - Planned Maintenance

Resolved

Resolved Jul 22, 2026 at 7:00am UTC

this only applies to skid1

1 previous update

Jul 21, 2026
1 incident

Texas - Curtailment

Resolved

Resolved Jul 22, 2026 at 3:50am UTC

EC007: Project Dorothy is now exiting curtailment and energizing.

1 previous update

Jul 20, 2026
1 incident

Texas - Curtailment

Resolved

Resolved Jul 21, 2026 at 1:48am UTC

Project Dorothy is now exiting curtailment and energizing.

1 previous update

Jul 19, 2026
1 incident

Texas - Curtailment

Resolved

Resolved Jul 19, 2026 at 11:26pm UTC

4CP Curtailment ended

1 previous update

Jul 17, 2026
1 incident

Norway - Planned Maintenance

Resolved

Resolved Jul 17, 2026 at 10:31am UTC

Norway - [Planned Maintenance] is complete at 12:30 local time.

1 previous update

Jul 10, 2026
2 incidents

Norway - Maintenance

Resolved

Resolved Jul 13, 2026 at 2:26pm UTC

Resolved

1 previous update

South Dakota - Utility Provider Issues

Resolved

Resolved Jul 13, 2026 at 7:57am UTC

The utility provider issues have been resolved, mine is back online.

1 previous update

Jul 01, 2026
1 incident

4CP 1st of the month curtailment

Resolved

Resolved Jul 2, 2026 at 12:00am UTC

Curtailment has finished and mining operations are gradually getting back to full capacity.

1 previous update

June 2026
Jun 26, 2026
1 incident

Norway - Curtailment

Resolved

Resolved Jun 27, 2026 at 7:05am UTC

The mine is back fully operational.

2 previous updates

Jun 23, 2026
1 incident

Norway - Curtailment

Resolved

Resolved Jun 23, 2026 at 1:00pm UTC

For today (23 June 2026) high prices are forecasted. To optimize costs, we plan to reduce operations during the day.
Start time: 15:00 CET

End times and the expected duration will be confirmed during the day once final prices and conditions are clearer.

Jun 20, 2026
1 incident

Investigating – Login Issues

Resolved

Resolved Jun 20, 2026 at 12:15pm UTC

Resolved – Login Issues

The login issue affecting the app has been resolved. Users should now be able to log in normally.

Thank you for your patience.

1 previous update

Jun 19, 2026
1 incident

Container Z1 in maintenance

Resolved

Resolved Jun 19, 2026 at 9:00am UTC

All maintenance activities are expected to begin at approximately 8:00 AM Paraguay time

Jun 18, 2026
1 incident

Container Z3 in maintenance

Resolved

Resolved Jun 18, 2026 at 9:00am UTC

All maintenance activities are expected to begin at approximately 8:00 AM Paraguay time

Jun 17, 2026
1 incident

Container Z2 in maintenance

Resolved

Resolved Jun 17, 2026 at 4:18pm UTC

We are pleased to inform you that the consumption levels for container Z2 have been restored to normal.

1 previous update

Jun 16, 2026
1 incident

Norway - Curtailment

Resolved

Resolved Jun 18, 2026 at 10:06am UTC

high prices are forecasted for today (18 June 2026). To optimize costs, the operations will be reduced.

Start time: 17:45 CET
End time: 18:45 CET

2 previous updates

Jun 15, 2026
1 incident

ANDE - high voltage fluctuations in the electrical grid

Resolved

Resolved Jun 16, 2026 at 8:17am UTC

We are pleased to confirm that consumption levels for the affected container have been fully restored and that production has returned to its normal operating levels.

This event began on June 15, 2026, at 09:21 (GMT -3) and concluded at 18:40 (GMT -3), with a total duration of 9 hours and 19 minutes.

1 previous update

Jun 10, 2026
1 incident

Norway - Annual Cooling Maintenance

Resolved

Resolved Jun 11, 2026 at 11:06am UTC

Maintenance finished and mine is back online.

1 previous update

Jun 03, 2026
1 incident

Paraguay - Network Maintenance

Resolved

Resolved Jun 8, 2026 at 9:22am UTC

Network maintenance has been completed and all containers are back online.

1 previous update