Previous incidents
Paraguay - Curtailment
Resolved Nov 22, 2026 at 3:40pm UTC
Following our previous communication, we would like to provide full details
regarding the consumption regulation requested by ANDE.
ANDE instructed us to partially stop production, which was implemented as
requested. The reason provided by ANDE was: overload on the LI-220 kV
PIH-MD line.
They contacted us on November 22, 2026, at 09:56 (GMT -3) via WhatsApp
message, approximately 6 minutes before the requested curtailment began. As
usual, no email notification was received.
The curtailment...
1 previous update
Paraguay - Maintenance [D22]
Resolved Nov 22, 2026 at 10:55am UTC
We would like to inform you that container D22 was temporarily out of
service due to an electrical system issue that caused the main circuit
breaker (TM) to trip.
This event began at 07:35 hours (GMT -3) and concluded at 07:55 hours (GMT
-3), with a total duration of 20 minutes.
Production has been fully restored.
1 previous update
Paraguay - Curtailment
Resolved Nov 21, 2026 at 12:21am UTC
Following our previous communication, we would like to provide additional
details regarding the consumption regulation requested by ANDE.
They have instructed us to stop part of the production, which has already
been implemented.
ANDE explained that this request was made due to the following reason: 220
kV Transmission Line Overload.
This curtailment started on November 20, 2026, at 19:51 (GMT -3) and
concluded on November 20, 2026, at 21:21 (GMT -3), the reduction request
was for 20MW, di...
1 previous update
Paraguay - Curtailment
Resolved Nov 20, 2026 at 7:02pm UTC
Following our previous communication, we would like to provide additional
details regarding the consumption regulation requested by ANDE.
They have instructed us to stop part of the production, which has already
been implemented.
ANDE explained that this request was made due to the following reason: 220
kV Transmission Line Overload.
This curtailment started on November 20, 2026, at 10:50 (GMT -3) and
concluded on November 20, 2026, at 16:02 (GMT -3), the reduction request
was for 20MW, di...
1 previous update
Paraguay - Curtailment
Resolved Nov 20, 2026 at 2:16am UTC
Following our previous communication, we would like to provide additional
details regarding the consumption regulation requested by ANDE.
They have instructed us to stop part of the production, which has already
been implemented.
ANDE explained that this request was made due to the following reason: 220
kV Transmission Line Overload.
This curtailment started on November 19, 2026, at 19:35 (GMT -3) and
concluded on November 19, 2026, at 23:16 (GMT -3), the reduction request
was for 25MW, di...
1 previous update
Norway - Curtailment
Created Nov 18, 2026 at 8:34am UTC
Operations are temporarily reduced due to high electricity prices.
Start time: 09:34 CET.
Paraguay - Curtailment
Resolved Nov 17, 2026 at 6:22pm UTC
Following our previous communication, we would like to provide additional
details regarding the consumption regulation requested by ANDE.
They have instructed us to stop part of the production, which has already
been implemented.
ANDE explained that this request was made due to the following reason: 220
kV Transmission Line Overload.
This curtailment started on November 17, 2026, at 10:58 (GMT -3) and
concluded on November 17, 2026, at 15:22 (GMT -3), the reduction request
was for 20MW, di...
1 previous update
Paraguay - Curtailment
Resolved Nov 17, 2026 at 1:57am UTC
Following our previous communication, we would like to provide full details
regarding the consumption regulation requested by ANDE.
ANDE instructed us to partially stop production, which was implemented as
requested. The reason provided by ANDE was: overload on the LI-220 kV
PIH-MD line.
They contacted us on November 16, 2026, at 19:08 (GMT -3) via WhatsApp
message, approximately 5 minutes before the requested curtailment began. As
usual, no email notification was received.
The curtailment...
1 previous update
Paraguay - Curtailment
Resolved Nov 16, 2026 at 6:42pm UTC
Following our previous communication, we would like to provide additional
details regarding the consumption regulation requested by ANDE.
They have instructed us to stop part of the production, which has already
been implemented.
ANDE explained that this request was made due to the following reason: 220
kV Transmission Line Overload.
This curtailment started on November 16, 2026, at 11:23 (GMT -3) and
concluded on November 16, 2026, at 15:42 (GMT -3), the reduction request
was for 10MW, di...
1 previous update
Paraguay - Curtailment
Resolved Nov 14, 2026 at 6:18pm UTC
Following our previous communication, we would like to provide additional
details regarding the consumption regulation requested by ANDE.
They have instructed us to stop part of the production, which has already
been implemented.
ANDE explained that this request was made due to the following reason: 220
kV Transmission Line Overload.
This curtailment started on November 14, 2026, at 11:07 (GMT -3) and
concluded on November 14, 2026, at 15:18 (GMT -3), the reduction request
was for 10MW, di...
1 previous update
Paraguay - Curtailment
Resolved Nov 14, 2026 at 1:31am UTC
Following our previous communication, we would like to provide full details
regarding the consumption regulation requested by ANDE.
ANDE instructed us to partially stop production, which was implemented as
requested. The reason provided by ANDE was: overload on the LI-220 kV
PIH-MD line.
They contacted us on November 13, 2026, at 10:50 (GMT -3) via WhatsApp
message, approximately 6 minutes before the requested curtailment began. As
usual, no email notification was received.
The curtailment...
1 previous update
Texas - Curtailment
Resolved Nov 13, 2026 at 1:34pm UTC
The Texas site is now exiting curtailment and energizing.
1 previous update
Texas - Curtailment
Resolved Nov 12, 2026 at 5:33am UTC
The Texas site is now exiting curtailment and energizing.
1 previous update
Texas - Curtailment
Resolved Nov 10, 2026 at 8:18am UTC
The Texas site is now exiting curtailment and energizing.
1 previous update
Texas - Curtailment
Resolved Nov 10, 2026 at 6:48am UTC
The Texas site is now exiting curtailment and energizing.
1 previous update
Texas - Curtailment
Resolved Nov 10, 2026 at 3:11am UTC
The Texas site is now exiting curtailment and energizing.
1 previous update
Texas - Curtailment
Resolved Nov 9, 2026 at 3:33am UTC
The Texas site is now exiting curtailment and energizing.
1 previous update
Texas - Curtailment
Resolved Nov 9, 2026 at 1:18am UTC
The Texas site is now exiting curtailment and energizing.
1 previous update
Paraguay - Curtailment
Resolved Nov 7, 2026 at 4:18pm UTC
Following our previous communication, we would like to provide full details
regarding the consumption regulation requested by ANDE.
ANDE instructed us to partially stop production, which was implemented as
requested. The reason provided by ANDE was: overload on the LI-220 kV
PIH-MD line.
They contacted us on November 7, 2026, at 10:54 (GMT -3) via WhatsApp
message, approximately 4 minutes before the requested curtailment began. As
usual, no email notification was received.
The curtailment ...
1 previous update
Paraguay - Curtailment
Resolved Nov 7, 2026 at 12:57am UTC
Following our previous communication, we would like to provide full details
regarding the consumption regulation requested by ANDE.
ANDE instructed us to partially stop production, which was implemented as
requested. The reason provided by ANDE was: overload on the LI-220 kV
PIH-MD line.
They contacted us on November 6, 2026, at 19:16 (GMT -3) via WhatsApp
message, approximately 9 minutes before the requested curtailment began. As
usual, no email notification was received.
The curtailment ...
1 previous update
Paraguay - Curtailment
Resolved Nov 6, 2026 at 8:34pm UTC
Following our previous communication, we would like to provide additional
details regarding the consumption regulation requested by ANDE.
They have instructed us to stop part of the production, which has already
been implemented.
ANDE explained that this request was made due to the following reason: 220
kV Transmission Line Overload.
This curtailment started on November 6, 2026, at 15:11 (GMT -3) and
concluded on November 06, 2026, at 17:34 (GMT -3), the reduction request
was for 30MW, dis...
1 previous update
Paraguay - Curtailment
Resolved Nov 6, 2026 at 5:50pm UTC
Following our previous communication, we would like to provide additional
details regarding the consumption regulation requested by ANDE.
They have instructed us to stop part of the production, which has already
been implemented.
ANDE explained that this request was made due to the following reason: 220
kV Transmission Line Overload.
This curtailment started on November 6, 2026, at 13:40 (GMT -3) and
concluded on November 06, 2026, at 14:50 (GMT -3), the reduction request
was for 20MW, dis...
1 previous update
Paraguay - Curtailment
Resolved Nov 4, 2026 at 6:57pm UTC
Following our previous communication, we would like to provide additional
details regarding the consumption regulation requested by ANDE.
They have instructed us to stop part of the production, which has already
been implemented.
ANDE explained that this request was made due to the following reason: 220
kV Transmission Line Overload.
This curtailment started on November 4, 2026, at 13:22 (GMT -3) and
concluded on November 04, 2026, at 15:57 (GMT -3), the reduction request
was for 25MW, dis...
1 previous update
Paraguay - Curtailment
Resolved Nov 4, 2026 at 3:24pm UTC
Following our previous communication, we would like to provide additional
details regarding the consumption regulation requested by ANDE.
They have instructed us to stop part of the production, which has already
been implemented.
ANDE explained that this request was made due to the following reason: 220
kV Transmission Line Overload.
This curtailment started on November 4, 2026, at 10:13 (GMT -3) and
concluded on November 04, 2026, at 12:24 (GMT -3), the reduction request
was for 20MW, dis...
1 previous update
Texas - Curtailment
Resolved Nov 4, 2026 at 3:19am UTC
The Texas site is now exiting curtailment and energizing.
1 previous update
Paraguay - Curtailment
Resolved Nov 4, 2026 at 12:22am UTC
Following our previous communication, we would like to provide further
details regarding the power curtailment requested by ANDE.
ANDE instructed us to partially reduce production due to an overload on the
220 kV MD–PIH transmission line. The requested curtailment was implemented
accordingly.
ANDE notified us of this request via WhatsApp on November 3, 2026, at 19:21
(GMT-3), approximately 6 minutes before the requested curtailment was
scheduled to begin. As usual, no official email notific...
1 previous update
Norway - Maintenance
Resolved Nov 2, 2026 at 3:06pm UTC
Operations have resumed and the site is returning to full capacity.
1 previous update
Texas - Curtailment
Resolved Nov 1, 2026 at 4:34am UTC
The Texas site is now exiting curtailment and energizing.
1 previous update
Texas - Curtailment
Resolved Nov 1, 2026 at 3:48am UTC
The Texas site is now exiting curtailment and energizing.
1 previous update
Texas - Curtailment
Resolved Nov 1, 2026 at 2:15am UTC
The Texas site is now exiting curtailment and energizing.
1 previous update
Texas - Curtailment
Resolved Oct 31, 2026 at 11:19pm UTC
The Texas site is now exiting curtailment and energizing.
1 previous update
Texas - Curtailment
Resolved Oct 31, 2026 at 3:03pm UTC
The Texas site is now exiting curtailment and energizing.
1 previous update
Paraguay - Curtailment
Resolved Oct 30, 2026 at 2:07pm UTC
Following our previous communication, we would like to provide full details
regarding the consumption regulation requested by ANDE.
ANDE instructed us to partially reduce production, which was implemented as
requested. The reason provided by ANDE was the outage of the 220 kV MD-IRY
transmission line.
They contacted us on October 30, 2026, at 10:01 hours (GMT -3) via
WhatsApp, approximately 18 minutes before the requested curtailment began.
The curtailment began on October 30, 2026, at 10:1...
1 previous update
Norway - Maintenance
Resolved Oct 28, 2026 at 1:20pm UTC
The cooling system maintenance at the Norway site has been completed. Operations have resumed and the site is returning to full capacity.
1 previous update
Paraguay - Maintenance [B12, B22, B32, D22, Z1, Z2, Z3]
Resolved Oct 20, 2026 at 10:15am UTC
We would like to inform you that containers B12, B22, B32, Z1, Z2, Z3, and
D22 were temporarily operating at partial capacity due to the restart of
the DATUM Gateway on your end.
This event began at 06:37 (GMT -3) and concluded at 07:15 (GMT -3), with a
total duration of 38 minutes.
We are pleased to inform you that production has been restored to normal
levels.
1 previous update
Paraguay - Maintenance [T32, T42]
Resolved Oct 19, 2026 at 4:52pm UTC
We are pleased to inform you that the consumption levels for containers T32
and T42 have been restored to normal.
The modulation event, which began at 07:42 hours (GMT -3), ended at 13:52
hours (GMT -3) and lasted 6 hours and 10 minutes. Production has now
returned to its standard levels.
1 previous update
Texas - Curtailment
Resolved Oct 15, 2026 at 3:33am UTC
The Texas site is now exiting curtailment and energizing.
1 previous update
Texas - Curtailment
Resolved Oct 15, 2026 at 2:49am UTC
The Texas site is now exiting curtailment and energizing.
1 previous update
Texas - Curtailment
Resolved Oct 13, 2026 at 10:48pm UTC
The Texas site is now exiting curtailment and energizing.
1 previous update
Texas - Curtailment
Resolved Oct 12, 2026 at 5:38am UTC
The Texas site is now exiting curtailment and energizing.
1 previous update
Texas - Curtailment
Resolved Oct 10, 2026 at 12:19am UTC
The Texas site is now exiting curtailment and energizing.
1 previous update
Texas - Curtailment
Resolved Oct 9, 2026 at 12:19pm UTC
The Texas site is now exiting curtailment and energizing.
1 previous update
Texas - Curtailment
Resolved Oct 9, 2026 at 3:35am UTC
The Texas site is now exiting curtailment and energizing.
1 previous update
Texas - Curtailment
Resolved Oct 8, 2026 at 3:33am UTC
The Texas site is now exiting curtailment and energizing.
1 previous update
Texas - Curtailment
Resolved Oct 7, 2026 at 11:19pm UTC
The Texas site is now exiting curtailment and energizing.
1 previous update
Paraguay - Maintenance [Z3]
Resolved Oct 7, 2026 at 3:12pm UTC
We are pleased to inform you that the consumption levels for container Z3 have
been restored to normal.
The modulation event, which began on October 07, 2026, at 08:01 hours (GMT
-3), ended on October 07, 2026, at 12:12 hours (GMT -3) and lasted 4 hours
and 11 minutes. Production has now returned to its standard levels.
1 previous update
Paraguay - Maintenance [Z2, Z3]
Resolved Oct 7, 2026 at 7:36pm UTC
We would like to inform you that racks 7, 8, 9, and 10 of container Z2 were
temporarily out of service due to corrective maintenance.
The event began on October 06, 2026, at 12:25 (GMT -3) and concluded on
October 07, 2026, at 16:36 (GMT -3), with a total duration of 28 hours and
11 minutes.
We are pleased to confirm that the service has been fully restored, and
container Z2 is now operating normally. Production has returned to standard
levels.
Additionally, container Z3 temporarily reduce...
1 previous update
Texas - Curtailment
Resolved Oct 7, 2026 at 1:35am UTC
The Texas site is now exiting curtailment and energizing.
1 previous update
Texas - Curtailment
Resolved Oct 7, 2026 at 12:49am UTC
The Texas site is now exiting curtailment and energizing.
1 previous update
Paraguay - Maintenance [Z2]
Resolved Oct 6, 2026 at 11:10pm UTC
We would like to inform you of a scheduled maintenance window at our
Hernandarias data center campus.
Date: Wednesday, October 7, 2026
Time: 09:00 – 11:00 (Paraguay time, UTC-3) / 12:00 – 14:00 UTC
Maximum duration: 2 hours
Scope: Firmware upgrade of the site's perimeter firewall cluster.
Expected impact: The upgrade will be performed on a high-availability
cluster with session synchronization enabled, so no service impact is
expected. However, brief connectivity intermittencies may occur ...
1 previous update
Paraguay - Maintenance [Z2]
Resolved Oct 6, 2026 at 2:59pm UTC
We are pleased to inform you that the consumption levels for container Z2 have
been restored to normal.
The modulation event, which began on October 06, 2026, at 08:07 hours (GMT
-3), ended on October 06, 2026, at 11:59 hours (GMT -3) and lasted 3
hours and 52 minutes. Production has now returned to its standard levels.
1 previous update
Texas - Curtailment
Resolved Oct 6, 2026 at 3:34am UTC
The Texas site is now exiting curtailment and energizing.
1 previous update
Texas - Curtailment
Resolved Oct 6, 2026 at 3:04am UTC
The Texas site is now exiting curtailment and energizing.
1 previous update
Paraguay - Maintenance [Z1, Z3]
Resolved Oct 5, 2026 at 3:25pm UTC
We are pleased to inform you that the consumption levels for container Z1 have
been restored to normal.
The modulation event, which began at 08:00 hours (GMT -3), ended at 12:25
hours (GMT -3) and lasted 4 hours and 24 minutes. Production has now
returned to its standard levels.
Additionally, container Z3 had its production reduced to safely return
Transformer
Z1 to service. After 13 minutes, container Z3 resumed its normal production
levels.
1 previous update
Texas - Curtailment
Resolved Oct 5, 2026 at 12:32pm UTC
The Texas site is now exiting curtailment and energizing.
1 previous update
Paraguay - Maintenance [B12]
Resolved Oct 4, 2026 at 9:42pm UTC
We hope this message finds you well.
We would like to inform you that container B12 was temporarily out of
service due to a water leak from one of the miner hoses, which caused the
main recirculation pump to stop.
The incident began on October 4, 2026, at 17:52 (GMT -3) and concluded at
18:42 (GMT -3), with a total duration of 50 minutes.
We are pleased to confirm that the issue has been resolved and that
container B12 is now fully operational, with consumption levels restored
and producti...
1 previous update
Texas - Curtailment
Resolved Oct 4, 2026 at 8:32am UTC
The Texas site is now exiting curtailment and energizing.
1 previous update
Texas - Curtailment
Resolved Oct 4, 2026 at 7:32am UTC
The Texas site is now exiting curtailment and energizing.
1 previous update
Texas - Curtailment
Resolved Oct 4, 2026 at 6:32am UTC
The Texas site is now exiting curtailment and energizing.
1 previous update
Texas - Curtailment
Resolved Oct 2, 2026 at 4:04am UTC
The Texas site is now exiting curtailment and energizing.
1 previous update
Norway - Curtailment
Resolved Sep 30, 2026 at 12:22pm UTC
curtailment is over
1 previous update
Paraguay - Power Outage [D22]
Resolved Sep 29, 2026 at 8:52pm UTC
We would like to inform you that container D22 was temporarily operating at
reduced production due to an overvoltage recorder caused by the outage of
the 500 kV Transmission Line.
The event began on September, 29, 2026, at 16:07 (GMT -3) and concluded on
September 29, 2026, at 17:52 (GMT -3), with a total duration of 1 hour and
45 minutes.
We are pleased to confirm that the service has been fully restored, and
container D22 is now operating normally. Production has returned to
standard levels.
1 previous update
Paraguay - Curtailment
Resolved Sep 29, 2026 at 2:05am UTC
Following our previous communication, we would like to provide additional
details regarding the power consumption regulation requested by ANDE.
They instructed us to curtail part of our production, which was fully
implemented.
ANDE explained that this request was made due to operational restrictions.
The reduction requests from ANDE were carried out in three stages in
accordance with their requirements:
First Curtailment Stage:
ANDE contacted us at 10:35 (GMT-3) via WhatsApp message to r...
1 previous update
Paraguay - Curtailment
Resolved Sep 28, 2026 at 5:00am UTC
Production returned to normal at approximately 02:00 (GMT-3) on September 28, 2026.
1 previous update
Texas - Curtailment
Resolved Sep 28, 2026 at 1:34am UTC
The Texas site is now exiting curtailment and energizing.
1 previous update
Norway - Curtailment
Resolved Sep 28, 2026 at 8:02am UTC
curtailment ended
1 previous update
Texas - Curtailment
Resolved Sep 23, 2026 at 10:25am UTC
The Texas site is now exiting curtailment and energizing.
1 previous update
Texas - Curtailment
Resolved Sep 23, 2026 at 3:48am UTC
The Texas site is now exiting curtailment and energizing.
1 previous update
Texas - Curtailment
Resolved Sep 23, 2026 at 2:34am UTC
The Texas site is now exiting curtailment and energizing.
1 previous update
Texas - Curtailment
Resolved Sep 22, 2026 at 9:31pm UTC
The Texas site is now exiting curtailment and energizing.
1 previous update
Paraguay - Maintenance [T32, T42]
Resolved Sep 21, 2026 at 10:42pm UTC
We would like to inform you that containers T32 and T42 were temporarily
operating at reduced production due to elevated temperature of the machines.
The event began on September 21, 2026, at 14:29 (GMT -3) and concluded on
September 21, 2026, at 19:42 (GMT -3), with a total duration of 5 hours and
13 minutes.
We are pleased to confirm that the service has been fully restored, and
containers T32 and T42 are now operating normally. Production has returned
to standard levels.
1 previous update
Texas - Curtailment
Resolved Sep 21, 2026 at 9:56pm UTC
The Texas site is now exiting curtailment and energizing.
1 previous update
Texas - Curtailment
Resolved Sep 20, 2026 at 11:19pm UTC
The Texas site is now exiting curtailment and energizing.
1 previous update
Paraguay - Power Outage [B12, B22, B32, D22]
Resolved Sep 20, 2026 at 6:39pm UTC
We would like to inform you that containers D22, B12, B22 and B32 were
temporarily operating at reduced production due to an overvoltage on the
220 kV MD–PIH transmission line.
The event began on September 20, 2026, at 13:06 (GMT -3) and concluded on
September 20, 2026, at 15:39 (GMT -3), with a total duration of 2 hours and
33 minutes.
We are pleased to confirm that the service has been fully restored, and
containers D22, B12, B22 and B32 are now operating normally. Production has
returned...
1 previous update
Texas - Curtailment
Resolved Sep 20, 2026 at 12:33am UTC
The Texas site is now exiting curtailment and energizing.
1 previous update
Texas - Curtailment
Resolved Sep 18, 2026 at 1:29am UTC
The Texas site is now exiting curtailment and energizing.
1 previous update
Texas - Curtailment
Resolved Sep 18, 2026 at 1:18am UTC
The Texas site is now exiting curtailment and energizing.
1 previous update
Texas - Curtailment
Resolved Sep 17, 2026 at 2:04am UTC
The Texas site is now exiting curtailment and energizing.
1 previous update
Texas - Curtailment
Resolved Sep 17, 2026 at 12:40am UTC
The Texas site is now exiting curtailment and energizing.
1 previous update
Texas - Curtailment
Resolved Sep 17, 2026 at 12:30am UTC
The Texas site is now exiting curtailment and energizing.
1 previous update
Texas - Curtailment
Resolved Sep 17, 2026 at 12:20am UTC
The Texas site is now exiting curtailment and energizing.
1 previous update
Texas - Curtailment
Resolved Sep 16, 2026 at 11:02pm UTC
The Texas site is now exiting curtailment and energizing.
1 previous update
Texas - Curtailment
Resolved Sep 16, 2026 at 8:04pm UTC
The Texas site is now exiting curtailment and energizing.
1 previous update
Texas - Curtailment
Resolved Sep 15, 2026 at 11:17pm UTC
The Texas site is now exiting curtailment and energizing.
1 previous update
Texas - Curtailment
Resolved Sep 15, 2026 at 9:35pm UTC
The Texas site is now exiting curtailment and energizing.
1 previous update
Norway - Curtailment
Resolved Sep 15, 2026 at 7:00am UTC
Іnform you that electricity prices have dropped and we've launched the miners. Miners are now reaching their target capacity.
1 previous update
Texas - Curtailment
Resolved Sep 14, 2026 at 11:47pm UTC
The Texas site is now exiting curtailment and energizing.
1 previous update
Texas - Curtailment
Resolved Sep 13, 2026 at 11:10pm UTC
The Texas site is now exiting curtailment and energizing.
1 previous update
Texas - Curtailment
Resolved Sep 12, 2026 at 11:47pm UTC
The Texas site is now exiting curtailment and energizing.
1 previous update
Texas - Curtailment
Resolved Sep 11, 2026 at 10:11pm UTC
The Texas site is now exiting curtailment and energizing.
1 previous update
Paraguay - Maintenance
Resolved Sep 11, 2026 at 7:21pm UTC
We would like to inform you that containers B12, B22, B32, D22, T32, T42, Z1, Z2, and Z3 were temporarily out of service due to an incident: an ANDE 220 kV transmission line outage caused by the activation of overvoltage protection.
The event, which began at 13:47 hours (GMT -3), ended at 16:21 hours (GMT -3) and lasted 2 hours and 34 minutes. Production has now returned to its standard levels.
1 previous update
Texas - Curtailment
Resolved Sep 10, 2026 at 11:43pm UTC
The Texas site is now exiting curtailment and energizing.
1 previous update
Texas - Curtailment
Resolved Sep 10, 2026 at 11:32pm UTC
The Texas site is now exiting curtailment and energizing.
1 previous update
Texas - Curtailment
Resolved Sep 10, 2026 at 11:22pm UTC
The Texas site is now exiting curtailment and energizing.
1 previous update
Texas - Curtailment
Resolved Sep 10, 2026 at 11:12pm UTC
The Texas site is now exiting curtailment and energizing.
1 previous update
Texas - Curtailment
Resolved Sep 9, 2026 at 10:41pm UTC
Dorothy_EC007: Project Dorothy is now exiting curtailment and energizing.
1 previous update
Norway - Curtailment
Resolved Sep 10, 2026 at 8:27am UTC
All rigs are powering back up after curtailment.
1 previous update
Texas - Curtailment
Resolved Sep 9, 2026 at 2:49am UTC
Dorothy_EC007: Project Dorothy is now exiting curtailment and energizing.
1 previous update
Texas - Curtailment
Resolved Sep 8, 2026 at 11:47pm UTC
Dorothy_EC007: Project Dorothy is now exiting curtailment and energizing.
1 previous update
Texas - Curtailment
Resolved Sep 7, 2026 at 11:57pm UTC
Dorothy_EC007: Project Dorothy is now exiting curtailment and energizing.
1 previous update
Norway - Curtailment
Resolved Sep 7, 2026 at 5:30am UTC
Please note that high prices are forecasted for tomorrow (7 September 2026). To optimize costs, the operations will be reduced.
Start time: 5:45 CET
End time: 7:30 CET
1 previous update
Paraguay - Overvoltage
Resolved Sep 5, 2026 at 10:58am UTC
We would like to inform you that containers D22 and Z2 were temporarily affected by an overvoltage event on the 220 kV MD–PIH transmission line.
The event began on September 05, 2026, at 06:26 (GMT -3) and concluded on September 05, 2026, at 07:58 (GMT -3), with a total duration of 1 hour and 31 minutes.
We are pleased to confirm that the event has been fully resolved and that containers D22 and Z2 are now operating normally. Production has returned to standard levels.
1 previous update
Texas - Curtailment
Resolved Sep 3, 2026 at 2:35am UTC
Dorothy_EC007: Project Dorothy is now exiting curtailment and energizing.
1 previous update
Texas - Curtailment
Resolved Sep 2, 2026 at 11:47pm UTC
Dorothy_EC007: Project Dorothy is now exiting curtailment and energizing.
1 previous update
Texas - Curtailment
Resolved Sep 2, 2026 at 1:49am UTC
Dorothy_EC007: Project Dorothy is now exiting curtailment and energizing.
1 previous update
Texas - Curtailment
Resolved Sep 2, 2026 at 12:01am UTC
Dorothy_EC007: Project Dorothy is now exiting curtailment and energizing.
1 previous update
Norway - Curtailment
Resolved Sep 1, 2026 at 12:00pm UTC
Please note that high prices are forecasted for tomorrow (1 September 2026). To optimize costs, we plan to reduce operations during the following periods (local time):
6:15 — 10:15
10:45 — 11:00
11:45 — 12:15
12:45 — 13:45
1 previous update