Previous incidents
All Dams are offline.
Resolved Dec 29, 2025 at 9:37pm UTC
Outage due to blizzard conditions.
1 previous update
ANDE Utility Curtailement - reduced load
Resolved Dec 19, 2025 at 6:04pm UTC
We would like to inform you that ANDE has requested a new consumption reduction, which will be implemented shortly.
Further updates regarding this operation will be provided once the reduction process has been completed.
ANDE Utility Curtailement - reduced load
Resolved Dec 15, 2025 at 7:08pm UTC
They have instructed us to stop part of the production, which has already been implemented. ANDE explained that this request was made due to the following reason: overload on the 220 kV MD–PIH transmission line.
This curtailment started at 13:26 AM (GMT -3), and the reduction request was for 30 MW, distributed proportionally among all clients. The curtailment is expected to last approximately 5 hours, as indicated by ANDE.
Dam 4 is online! Curtailment is limited, but persists due to low river levels
Resolved Nov 27, 2025 at 1:16am UTC
Transformer replaced at Dam #4 and flowage has increased river flow to the dam. Zero curtailment, currently!
Dam 4 is online! Curtailment is limited, but persists due to low river levels. Curtailment is currently at 14% of the fleet and will roll to new sections of the facility on a 24 hour basis.
Hydro container B12 at 50% of production
Resolved Nov 18, 2025 at 1:33pm UTC
We would like to inform you that container B12 is currently operating at 50% of its production capacity due to work being carried out near the power transformer.
This event began at 08:40 hours (GMT -3) and is expected to last approximately 2 hours. Production will be restored as soon as possible.
We are pleased to inform you that the consumption level of container B12 has returned to normal.
The modulation event, which began at 08:40 hours (GMT -3), ended at 11:38 hours (GMT -3) and ...
ANDE Transmission Event
Resolved Oct 22, 2025 at 12:07pm UTC
The ANDE transmission line has had a major transmission event, affecting power delivery to the entire site. Operations are bringing the fleet back up. Normal service should return within a few hours.
ANDE Utility - Mandatory Curtailment - ~6 hours
Resolved Oct 17, 2025 at 7:56am UTC
The curtailment commenced at 10:57 hours (GMT -3) and concluded at 14:22 hours (GMT -3). We are pleased to inform you that production across the project has been fully restored to normal.
This curtailment lasted for 3 hours and 25 minutes.
1 previous update